雷击下110 kV共享铁塔的接地可靠性研究

Grounding Reliability of 110 kV Shared Tower under Lightning Strike

  • 摘要: 为分析雷击下共享铁塔的电磁暂态特性以及不同接地方案对共享铁塔接地可靠性的影响,首先建立了雷击下110 kV共享铁塔的分流模型,分析了铁塔基数对计算结果的影响;然后计算了共享铁塔的分流系数以及塔顶、接地体的暂态电位、电流分布;最后从地电位升均衡性与铁塔防雷性能角度出发,分析了接地类型、接地网等电位连接点个数、通信设备高度等因素对共享铁塔接地可靠性的影响。结果表明,铁塔共享前后,塔顶与横担位置处的雷电过电压幅值偏差较小,不会影响铁塔的防雷性能;当基站接地网等电位接入铁塔接地网后,地电位升明显降低,电位均衡性提高;通信设备位于塔身时,地电位均衡性较好。该研究结果可为共享铁塔的接地方案设计提供参考。

     

    Abstract: In order to analyze the electromagnetic transient characteristics of shared tower under lightning strike and the influence of different grounding schemes on the grounding reliability of sharing tower, the shunt model of 110 kV shared tower under lightning strike is established, and the influence of tower base number on the calculation results is analyzed. Then, the shunt coefficient of shared tower, transient voltage and current distribution of tower top and grounding body are calculated. Finally, the influence of grounding grid connection type, the number of grounding grid equipotential connection points and the height of communication equipment on the grounding reliability of shared tower are analyzed from the perspective of ground potential rise balance and tower lightning protection performance. The results show that before and after the tower shared, the lightning overvoltage amplitude deviation at the top of the tower and the cross arm position is small, which will not affect the lightning protection performance of the tower. When the equipotential of the base station ground network is connected to the tower ground network, the ground potential rise is significantly reduced and the potential balance is improved. When the communication equipment is located on the tower, the ground potential is well balance. The research results can provide reference for grounding scheme design of shared tower.

     

/