架线过程中杆塔临时拉线受力研究

潘进, 左智勇, 王守长, 钱程

潘进, 左智勇, 王守长, 钱程. 架线过程中杆塔临时拉线受力研究[J]. 电力勘测设计, 2024, (8): 84-89. DOI: 10.13500/j.dlkcsj.issn1671-9913.2024.08.013
引用本文: 潘进, 左智勇, 王守长, 钱程. 架线过程中杆塔临时拉线受力研究[J]. 电力勘测设计, 2024, (8): 84-89. DOI: 10.13500/j.dlkcsj.issn1671-9913.2024.08.013
PAN Jin, ZUO Zhi-yong, WANG Shou-zhang, QIAN Cheng. Research on the Force Acting on Temporary Cables of Towers During the Process of Line Stringing[J]. Electric Power Survey & Design, 2024, (8): 84-89. DOI: 10.13500/j.dlkcsj.issn1671-9913.2024.08.013
Citation: PAN Jin, ZUO Zhi-yong, WANG Shou-zhang, QIAN Cheng. Research on the Force Acting on Temporary Cables of Towers During the Process of Line Stringing[J]. Electric Power Survey & Design, 2024, (8): 84-89. DOI: 10.13500/j.dlkcsj.issn1671-9913.2024.08.013

架线过程中杆塔临时拉线受力研究

详细信息
    作者简介:

    潘进(1980—),男,硕士,高级工程师,从事输电线路设计工作

  • 中图分类号: TM75

Research on the Force Acting on Temporary Cables of Towers During the Process of Line Stringing

  • 摘要: 本文依托实际工程项目,以国网通用设计2E2-SJ2型耐张塔为研究对象,利用有限元方法计算了架线施工过程中临时拉线拉力的变化,探讨了不同的拉线预紧力对铁塔和拉线受力的影响,并通过现场试验监测施工全过程中临时拉线的拉力状态。有限元计算数据和试验数据表明,随着架线施工的推进,临时拉线拉力不断增大,实验数据与仿真模拟结果相对吻合。实际工程中临时拉线起到的平衡作用与设计值存在差异,地线挂点处的临时拉线拉力最大,需要加强设计,对于土质松软地区,需采用相应的地锚加固措施确保临时拉线能达到设计的平衡张力值。
    Abstract: This article is based on actual engineering projects and takes the original design of the 2E2-SJ2 tension tower as the research object. The finite element method is used to calculate the change of temporary wire pulling force during the erection process. And monitor the tension status of temporary cables throughout the construction process through on-site testing. The finite element calculation data and experimental data indicate that as the stringing construction progresses, the tension of the temporary cables continues to increase. The experimental data is relatively consistent with the simulation results. In practical engineering, there is a difference between the balancing effect of temporary cables and the design value. The temporary cables at the hanging point of the earth wire has the maximum pulling force, and the design needs to be strengthened,For areas with soft soil, corresponding anchor reinforcement measures need to be taken to ensure that the temporary cables can reach the designed balanced tension value.
  • [1] 高涛.输电线路杆塔倾斜的扶正处理[J].安全生产,2014(103):32-34.
    [2] 曹枚根,张若愚,朱云祥,等.输电线路铁塔面内预应力拉索抗风加固及设计参数影响研究[J].工业建筑,2022,52(8):48-56.
    [3] 贾国强,武力.断线工况对输电铁塔重量的影响[J].电力勘测设计,2014(3):64-67.
    [4] 高涛.电力线路临时拉线应用探讨[J].电力安全技术,2013,15(1):31-34.
    [5] 严继军,纪大付.探讨延长松弛挂线解决特殊塔位无法设置临时拉线的难题[J].中华民居,2012(3):189.
    [6] 冯斌,花雨生.输电线路工程紧线与挂线的施工[J].黑龙江科学,2016,7(20):20-21.
    [7] 周银,黄梓恒,王玥,等.基于激光扫描实测索形的斜拉索拉力测量方法[J].中国公路学报,2021,34(12):91-103.
    [8] 淡丹辉,赵一鸣,陈艳阳.拉索-阻尼器体系振动索力测量法研究[J].振动与冲击,2013,32(16):123-127.
    [9] 孙俊华,吕建国.浅谈真型铁塔试验[J].电力建设,1997(10):11-12.
计量
  • 文章访问数:  0
  • HTML全文浏览量:  0
  • PDF下载量:  0
  • 被引次数: 0
出版历程
  • 收稿日期:  2023-08-08
  • 刊出日期:  2024-08-30

目录

    /

    返回文章
    返回