Abstract:
Wind farm has the characteristics of many points and wide areas, and different land use modes are adopted in different parts. By combing the land management law、land use indicators for power engineering projects(wind farms)、classification of land use status, local land use regulations for power grid construction and other relevant laws and policies, combined with the specific problems faced by actual projects, it is pointed out that wind power projects are facing difficulties such as increasing restrictive policies, difficult location and layout of wind turbines, etc. At present, the usual land use pattern of wind power projects is difficult to continue. It is proposed that the wind power projects need to optimize the layout of the wind farm on the basis of comprehensively understanding the site situation,combine wind farm construction with local livelihood projects, combine temporary land with permanent land, and reserve restoration conditions for temporary projects, so as to overcome the land use predicament faced by the current wind power projects.