李冰冰, 吴林平, 张久龙, 段谟东, 王海飞. 黏土类工程屏障对尾矿坝中重金属污染物的迁移及阻滞特性研究[J]. 电力勘测设计, 2023, (S2): 79-84. DOI: 10.13500/j.dlkcsj.issn1671-9913.2023.S2.014
引用本文: 李冰冰, 吴林平, 张久龙, 段谟东, 王海飞. 黏土类工程屏障对尾矿坝中重金属污染物的迁移及阻滞特性研究[J]. 电力勘测设计, 2023, (S2): 79-84. DOI: 10.13500/j.dlkcsj.issn1671-9913.2023.S2.014
LI Bing-bing, WU Lin-ping, ZHANG Jiu-long, DUAN Mo-dong, WANG Hai-fei. Study on the Migration and Retardation Characteristics of Heavy Metal Pollutants in Tailings DAMS by Clay Engineering Barriers[J]. Electric Power Survey & Design, 2023, (S2): 79-84. DOI: 10.13500/j.dlkcsj.issn1671-9913.2023.S2.014
Citation: LI Bing-bing, WU Lin-ping, ZHANG Jiu-long, DUAN Mo-dong, WANG Hai-fei. Study on the Migration and Retardation Characteristics of Heavy Metal Pollutants in Tailings DAMS by Clay Engineering Barriers[J]. Electric Power Survey & Design, 2023, (S2): 79-84. DOI: 10.13500/j.dlkcsj.issn1671-9913.2023.S2.014

黏土类工程屏障对尾矿坝中重金属污染物的迁移及阻滞特性研究

Study on the Migration and Retardation Characteristics of Heavy Metal Pollutants in Tailings DAMS by Clay Engineering Barriers

  • 摘要: 重金属污染是全球环境面临的严峻问题之一,尤其在各大矿山及尾矿库中,重金属对周边的土壤及地下水污染尤为显著。我国尾矿库数量众多且规模巨大,是矿山重要设施之一和重金属元素聚集地。基于化—渗耦合作用下尾矿库中重金属污染物迁移规律及工程屏障系统对重金属的阻滞机理,采用有限元分析软件,对某金属矿山尾矿库建立数值分析模型,模拟库内渗流情况、重金属污染物迁移规律及工程屏障对重金属污染物的阻滞效果。计算结果表明:尾矿库中重金属迅速迁移,在5 a、15 a和30 a内扩散范围逐年增大;工程屏障能有效阻滞90%的污染物,并且其厚度的增加明显提高阻滞性能。通过对尾矿库重金属污染物迁移及工程屏障阻滞特性研究,为各矿山环境污染问题提供有效的防治思路。

     

    Abstract: Heavy metal pollution is one of the serious problems facing the global environment, and in the major mining tailings in the surrounding soil and groundwater contamination is particularly significant. The large number of tailings and huge, mine is one of the important facilities and heavy metals gathering. This paper based on the finite element analysis software, the establishment of a numerical model simulation of the tailings seepage, has been steady seepage field. The migration law of heavy metal pollutants was simulated, and the pollutant diffusion maps at 5, 15, and 30 years under steady-state seepage were obtained. At the same time, the barrier of the sewage barrier at 0.2 m and 0.5 m thickness was simulated, and the effect of blockage of pollutants was obvious. With the passage of time, the blockage effect of 0.5 m engineering barrier was more significant. By tailings heavy metal diffusion barrier and engineering numerical simulation analysis, to provide effective prevention ideas for the mine environment pollution problems.

     

/

返回文章
返回