廖鸣宇, 宋佩珂, 吴丹, 杨凌霜, 周德才, 史学涛, 黄清海. 基于BIM与GIS技术的变电工程站址总体规划方案研究[J]. 电力勘测设计, 2023, (S2): 46-51. DOI: 10.13500/j.dlkcsj.issn1671-9913.2023.S2.009
引用本文: 廖鸣宇, 宋佩珂, 吴丹, 杨凌霜, 周德才, 史学涛, 黄清海. 基于BIM与GIS技术的变电工程站址总体规划方案研究[J]. 电力勘测设计, 2023, (S2): 46-51. DOI: 10.13500/j.dlkcsj.issn1671-9913.2023.S2.009
LIAO Ming-yu, SONG Pei-ke, WU Dan, YANG Ling-shuang, ZHOU De-cai, SHI Xue-tao, HUANG Qing-hai. Research on the Overall Planning Scheme of Substation Site Based on BIM and GIS Technology[J]. Electric Power Survey & Design, 2023, (S2): 46-51. DOI: 10.13500/j.dlkcsj.issn1671-9913.2023.S2.009
Citation: LIAO Ming-yu, SONG Pei-ke, WU Dan, YANG Ling-shuang, ZHOU De-cai, SHI Xue-tao, HUANG Qing-hai. Research on the Overall Planning Scheme of Substation Site Based on BIM and GIS Technology[J]. Electric Power Survey & Design, 2023, (S2): 46-51. DOI: 10.13500/j.dlkcsj.issn1671-9913.2023.S2.009

基于BIM与GIS技术的变电工程站址总体规划方案研究

Research on the Overall Planning Scheme of Substation Site Based on BIM and GIS Technology

  • 摘要: 三维数字化技术在输变电工程设计、施工阶段的应用已较为广泛,但在工程前期规划和决策阶段应用相对较少。变电工程建设规模大、选址条件复杂,工程前期阶段站址总体规划方案对工程建设尤为重要,常规的二维图纸或文字难以形象直观地表达设计意图。通过对多源异构的BIM和GIS数据分析研究,解决了软件平台不统一、数据兼容性差、数据集成难的问题,实现真实场景下变电工程站址总体规划方案的三维可视化展示,辅助工程前期方案决策,提高沟通与决策效率,有利于推动变电工程全生命周期三维数字化建设。

     

    Abstract: Three-dimensional digitization technology has been widely used in the design and construction stages of power transmission and transformation engineering, but it is relatively seldom used in the pre-project planning and decision-making stage. The construction scale of substation engineering is large and the site selection conditions are complex. Therefore, the overall site planning scheme in the early stage of the project is particularly important for the project construction. It is difficult for the conventional two-dimensional drawings or text to express the design intention visually. Through the analysis and research of multi-source heterogeneous BIM and GIS data, the problems of inconsistent software platform, poor data compatibility, and difficult integration of GIS and BIM data are solved. The three-dimensional visual display of the overall planning scheme of the substation site under real scenarios is realized,which aids the preliminary decision-making of the project and improves the efficiency of communication and decisionmaking. It is helpful to promote the three-dimensional digitization construction of the whole life cycle of the power transformation project.

     

/