李新凯. 某滨海燃煤电厂总体规划设计及实施[J]. 电力勘测设计, 2023, (S2): 11-16. DOI: 10.13500/j.dlkcsj.issn1671-9913.2023.S2.003
引用本文: 李新凯. 某滨海燃煤电厂总体规划设计及实施[J]. 电力勘测设计, 2023, (S2): 11-16. DOI: 10.13500/j.dlkcsj.issn1671-9913.2023.S2.003
LI Xin-kai. Overall Plot Plan Design and Implementation Experience of a Coastal Coal-fired Power Plant[J]. Electric Power Survey & Design, 2023, (S2): 11-16. DOI: 10.13500/j.dlkcsj.issn1671-9913.2023.S2.003
Citation: LI Xin-kai. Overall Plot Plan Design and Implementation Experience of a Coastal Coal-fired Power Plant[J]. Electric Power Survey & Design, 2023, (S2): 11-16. DOI: 10.13500/j.dlkcsj.issn1671-9913.2023.S2.003

某滨海燃煤电厂总体规划设计及实施

Overall Plot Plan Design and Implementation Experience of a Coastal Coal-fired Power Plant

  • 摘要: 土地资源和海洋资源极为珍贵,充分利用现有厂址资源建设并对总体规划不断完善,对推进电厂的合理建设具有重大意义。本文通过对广东某滨海燃煤电厂在建设实施过程中遇到的实际问题进行回顾,为电厂总体规划方案设计及改进实施提供了有益的总结。按总规划容量做好项目的远景规划,一次规划、分期实施,在各期工程中对厂区总平面持续优化,对总体规划适时调整、完善,最终实现初始的容量目标。通过每期工程的厂区总平面优化,实现既定的规划目标。坚守用地红线及规划引领,充分利用厂址条件进行建设,是电厂发展的最合理选择。

     

    Abstract: Land and sea resources are extremely precious, making full use of the existing site resources and constantly improving the overall plot plan is of great significance to promote the rational construction of power plants. This paper reviews the practical problems encountered in the construction and implementation of a coastal coal-fired power plant in Guangdong, providing a useful summary for the design and improvement of the overall plot plan of the power plant.A long-term planning of the project is carried out according to the overall planning capacity, and the general layout of the plant is continuously optimized in each phase, the overall plan is adjusted and improved in a timely manner,so as to finally achieve the initial capacity target. By optimizing the general layout in each phase of the project, the established planning objectives were achieved and a number of benchmark achievements were set. Adhering to the red line of land use and planning leadership, and making full use of the conditions of the plant site for construction is the most reasonable choice for the development of the power plant, and it is the greatest respect for the land and marine resources.

     

/