廖鸣宇, 黎亮, 梁明, 宋佩珂, 吴丹, 杨凌霜. 基于BIM的变电工程围墙参数化建模研究[J]. 电力勘测设计, 2023, (1): 68-72,79. DOI: 10.13500/j.dlkcsj.issn1671-9913.2023.01.012
引用本文: 廖鸣宇, 黎亮, 梁明, 宋佩珂, 吴丹, 杨凌霜. 基于BIM的变电工程围墙参数化建模研究[J]. 电力勘测设计, 2023, (1): 68-72,79. DOI: 10.13500/j.dlkcsj.issn1671-9913.2023.01.012
LIAO Ming-yu, LI Liang, LIANG Ming, SONG Pei-ke, WU Dan, YANG Ling-shuang. Research on Parametric Modeling for Wall of Substation Engneering Based on BIM[J]. Electric Power Survey & Design, 2023, (1): 68-72,79. DOI: 10.13500/j.dlkcsj.issn1671-9913.2023.01.012
Citation: LIAO Ming-yu, LI Liang, LIANG Ming, SONG Pei-ke, WU Dan, YANG Ling-shuang. Research on Parametric Modeling for Wall of Substation Engneering Based on BIM[J]. Electric Power Survey & Design, 2023, (1): 68-72,79. DOI: 10.13500/j.dlkcsj.issn1671-9913.2023.01.012

基于BIM的变电工程围墙参数化建模研究

Research on Parametric Modeling for Wall of Substation Engneering Based on BIM

  • 摘要: 通过研究Dynamo程序节点,提出了基于Dynamo驱动Revit的围墙参数化建模方法,解决变电工程站区围墙建模参数化程度低、建模效率低等关键问题。此方法包含Dynamo逻辑关系和算法编写,形成参数化设计和自动化建模的工作流,更符合工程师的设计习惯,能够提高工作效率,保证模型精度,并推广了BIM技术在变电工程中的深入应用。

     

    Abstract: By studying Dynamo program nodes, a parameterized modeling method of the wall based on Dynamo driven Revit is proposed to solve the key problems of low parameterization degree and low modeling efficiency of the wall modeling in substation area. This method includes logic relation and algorithm compilation in Dynamo, forming the workflow of parametric design and automatic modeling, which is more in line with the design habits of engineers,greatly improving the work efficiency, ensuring the accuracy of the model, and promoting the in-depth application of BIM technology in substation engineering.

     

/