崔艳军, 陶刚, 丁伟翠. 基于BIM技术的特高压数字化管控系统在变电站工程中的应用[J]. 电力勘测设计, 2023, (1): 49-55. DOI: 10.13500/j.dlkcsj.issn1671-9913.2023.01.009
引用本文: 崔艳军, 陶刚, 丁伟翠. 基于BIM技术的特高压数字化管控系统在变电站工程中的应用[J]. 电力勘测设计, 2023, (1): 49-55. DOI: 10.13500/j.dlkcsj.issn1671-9913.2023.01.009
CUI Yan-jun, TAO Gang, DING Wei-cui. UHV Field Management and Control System Based on BIM Technology in Substation Engineering[J]. Electric Power Survey & Design, 2023, (1): 49-55. DOI: 10.13500/j.dlkcsj.issn1671-9913.2023.01.009
Citation: CUI Yan-jun, TAO Gang, DING Wei-cui. UHV Field Management and Control System Based on BIM Technology in Substation Engineering[J]. Electric Power Survey & Design, 2023, (1): 49-55. DOI: 10.13500/j.dlkcsj.issn1671-9913.2023.01.009

基于BIM技术的特高压数字化管控系统在变电站工程中的应用

UHV Field Management and Control System Based on BIM Technology in Substation Engineering

  • 摘要: 针对特高压变电站工程建设过程中的实际情况,提出一种基于BIM技术的特高压数字化管控系统的设计思路及各主要功能的实现方案。该系统利用各类物联网传感设备采集工程建设中的实时信息,以BIM模型构建变电站三维场景作为载体进行信息承载,并通过各传感器和模型信息进行耦合、计算、分析,实现各级管理功能及信息收录,将各类辅助信息反馈到三维模型上实现智慧化、精细化、数字化管理。在南昌1 000 kV特高压变电工程中充分应用了该系统,有效节约了信息查询统计的沟通成本和过程管控成本,支撑了工程高效高质量的建设,达到了项目的建设预期效果。

     

    Abstract: According to the actual situation in the construction of UHV substation, a design idea of UHV digital management and control system based on BIM technology and the realization scheme of each main function are proposed. The system uses various IoT sensing devices to collect real-time information in engineering construction,uses BIM model to build a three-dimensional substation scene as a carrier to carry information, and couples,calculates, and analyzes sensor and model information to achieve management functions at all levels And information collection, all kinds of auxiliary information are fed back to the 3D model to achieve intelligent, refined and digital management. The system is fully applied in the Nanchang 1000kV UHV substation project, which effectively saves the communication cost and process control cost of information query and statistics, supports the high-efficiency and highquality construction of the project, and achieves the expected construction effect of the project.

     

/