王芳. 火电厂煤泥输送泵初步选型计算[J]. 电力勘测设计, 2021, (S2): 141-144. DOI: 10.13500/j.dlkcsj.issn1671-9913.2021.S2.025
引用本文: 王芳. 火电厂煤泥输送泵初步选型计算[J]. 电力勘测设计, 2021, (S2): 141-144. DOI: 10.13500/j.dlkcsj.issn1671-9913.2021.S2.025
WANG Fang. Preliminary Selenction Caculation of Slime Conveying Pump In Power Plant[J]. Electric Power Survey & Design, 2021, (S2): 141-144. DOI: 10.13500/j.dlkcsj.issn1671-9913.2021.S2.025
Citation: WANG Fang. Preliminary Selenction Caculation of Slime Conveying Pump In Power Plant[J]. Electric Power Survey & Design, 2021, (S2): 141-144. DOI: 10.13500/j.dlkcsj.issn1671-9913.2021.S2.025

火电厂煤泥输送泵初步选型计算

Preliminary Selenction Caculation of Slime Conveying Pump In Power Plant

  • 摘要: 根据《火力发电厂除灰设计技术规程》规定并结合工程实际情况,借鉴煤矿膏体充填料浆输送经验公式推导过程进行初步计算总结,以供大家参考。

     

    Abstract: According to the Technical code for the design of ash handling system of fossil-fired power plant regulations and the actual situation of the project,referring to the derivation process of coal paste filling slurry transportation empirical formula,the preliminary calculation is summarized,for your reference.

     

/

返回文章
返回