陈文涛, 白晗, 刘舰, 浦仕勇, 李世良. 核电厂安全标准化班组建设实践[J]. 电力安全技术, 2024, 26(6): 13-15.
引用本文: 陈文涛, 白晗, 刘舰, 浦仕勇, 李世良. 核电厂安全标准化班组建设实践[J]. 电力安全技术, 2024, 26(6): 13-15.
CHEN Wentao, BAI Han, LIU Jian, PU Shiyong, LI Shiliang. Practice in Safety Standardization Team Building for Nuclear Power Plants[J]. Electric Safty Technology, 2024, 26(6): 13-15.
Citation: CHEN Wentao, BAI Han, LIU Jian, PU Shiyong, LI Shiliang. Practice in Safety Standardization Team Building for Nuclear Power Plants[J]. Electric Safty Technology, 2024, 26(6): 13-15.

核电厂安全标准化班组建设实践

Practice in Safety Standardization Team Building for Nuclear Power Plants

  • 摘要: 以某核电厂班组为例,从安全管理“5831”模型出发,阐述了核电厂班组安全建设管理体系,通过五项基础工作、八大支柱、三大支撑和一个目标的实践,取得了良好的应用成效,提升了班组安全管理水平,可为相关人员提供参考。

     

    Abstract: Taking a nuclear power plant team as an example, the team building safety management system for a nuclear power plant is specified starting from the safety management "5831" model. By the practice in the five basic tasks, eight backbones, three major supports and one goal, the system is applied with sound effects,which improves the team safety management level and available for relevant personnel as reference.

     

/

返回文章