Abstract:
The background of introducing the "Thirty Measures for Electric Power Construction" is briefed,and analyses are carried out on the purpose and significance of applying the "Thirty Measures for Electric Power Construction" in the infrastructure period of electric power engineering construction projects. Taking lifting injuries of a high incidence rate in electric power construction as an example, analyses are conducted on the common types and causes of lifting injuries, concerning three aspects of construction preparation, process safety management and exit safety management, based on which ideas and methods for effectively applying the "Thirty Measures for Electric Power Construction" in the infrastructure period are proposed available for communication and reference among the peers.