JIN Lu, JI Chongdong, LI Chengyu. Modeling of Water Transition System of Pumped Storage Power Station and Analysis on the Calculation Process[J]. Electric Safty Technology, 2023, 25(6): 49-54.
Citation: JIN Lu, JI Chongdong, LI Chengyu. Modeling of Water Transition System of Pumped Storage Power Station and Analysis on the Calculation Process[J]. Electric Safty Technology, 2023, 25(6): 49-54.

抽水蓄能电站过水系统建模及过渡过程计算分析

Modeling of Water Transition System of Pumped Storage Power Station and Analysis on the Calculation Process

  • 摘要: 通过对某抽水蓄能电站过水系统进行二端口网络建模,运用B样条拟合方法对水泵水轮机转轮拟合,搭建过水系统及机组水力模型,并将新模型的计算结果与真机试验数据进行比对分析,验证了此模型及方法的有效性,为抽水蓄能电站过渡过程研究提供了一种新的方法。

     

    Abstract: By modelling the two-port network of the water transition system for a pumped storage power station, the B-spline fitting method is used to fit the water turbine wheel of water pump, the water transition system and the hydraulic model of the unit are built, and the calculation results of the new model are compared with the real machine test data, based on which the effectiveness of this model and its fitting method is verified, offering a new means for the study of transition process of pumped storage power stations.

     

/