董济康. 调试过程中35 kV线路相序接反引起的故障[J]. 农村电气化, 2020, (1): 57-58. DOI: 10.13882/j.cnki.ncdqh.2020.01.017
引用本文: 董济康. 调试过程中35 kV线路相序接反引起的故障[J]. 农村电气化, 2020, (1): 57-58. DOI: 10.13882/j.cnki.ncdqh.2020.01.017
Dong Jikang. Fault Due to 35 kV Line Phase Sequence Opposing Connection in Regulation and Testing[J]. Rural Electrification, 2020, (1): 57-58. DOI: 10.13882/j.cnki.ncdqh.2020.01.017
Citation: Dong Jikang. Fault Due to 35 kV Line Phase Sequence Opposing Connection in Regulation and Testing[J]. Rural Electrification, 2020, (1): 57-58. DOI: 10.13882/j.cnki.ncdqh.2020.01.017

调试过程中35 kV线路相序接反引起的故障

Fault Due to 35 kV Line Phase Sequence Opposing Connection in Regulation and Testing

/

返回文章
返回