申建建, 王月, 程春田, 李秀峰, 苗树敏, 张一, 张俊涛. 水风光多能互补发电调度问题研究现状及展望[J]. 中国电机工程学报, 2022, 42(11): 3871-3884. DOI: 10.13334/j.0258-8013.pcsee.211765
引用本文: 申建建, 王月, 程春田, 李秀峰, 苗树敏, 张一, 张俊涛. 水风光多能互补发电调度问题研究现状及展望[J]. 中国电机工程学报, 2022, 42(11): 3871-3884. DOI: 10.13334/j.0258-8013.pcsee.211765
SHEN Jianjian, WANG Yue, CHENG Chuntian, LI Xiufeng, MIAO Shumin, ZHANG Yi, ZHANG Juntao. Research Status and Prospect of Generation Scheduling for Hydropower-wind-solar Energy Complementary System[J]. Proceedings of the CSEE, 2022, 42(11): 3871-3884. DOI: 10.13334/j.0258-8013.pcsee.211765
Citation: SHEN Jianjian, WANG Yue, CHENG Chuntian, LI Xiufeng, MIAO Shumin, ZHANG Yi, ZHANG Juntao. Research Status and Prospect of Generation Scheduling for Hydropower-wind-solar Energy Complementary System[J]. Proceedings of the CSEE, 2022, 42(11): 3871-3884. DOI: 10.13334/j.0258-8013.pcsee.211765

水风光多能互补发电调度问题研究现状及展望

Research Status and Prospect of Generation Scheduling for Hydropower-wind-solar Energy Complementary System

  • 摘要: 以水风光为主的可再生能源在过去二十年实现了前所未有的发展,未来也将是中国构建清洁低碳能源体系的核心组成部分,是兑现碳减排承诺的现实选择。该文简要分析了我国清洁能源发电的发展概况及典型水风光互补实际工程,提炼总结了互补系统发电调度面临的关键问题,包括大规模风光电站群以何种形式参与调度、间歇性时空发电规律如何描述、风光电站群与水电站群在长期、短期等时间尺度上如何协调运行;针对这些问题系统综述了国内外水风光互补协调研究方法及特点,并从风光电站集群汇聚、集群出力描述、及集群模式下水风光互补系统长期、短期协调建模与求解思路,阐述了技术实现过程,期望为我国多能互补工程实际运行提供切实可用的技术手段,助力“碳达峰、碳中和”目标。

     

    Abstract: Renewable energy dominated hydropower, wind and solar power has achieved unprecedented development in the past two decades. In the future, it will be the core component of China's clean and low-carbon energy system and the realistic choice to fulfill the carbon emission reduction commitment. This study analyzed the development of clean energy power generation in China and the typical practical projects of hydropower-wind-solar complementary system. Key problems of generation scheduling in complementary system were summarized, i.e., how to participate in the operation for large-scale wind and solar power plants, how to describe the intermittent spatial-temporal generation characteristics, and how to coordinate wind and solar power plants and hydropower plants on the long-term and short-term operations? In view of these problems, the coordination methods and characteristics of hydropower-wind-solar complementary research works were systematically reviewed. Moreover, the technical realization process were expounded in terms of the cluster of wind and solar power plants, the description of cluster generation, the modeling and solution of long-term and short-term coordination of hydropower- wind-solar complementary system. We hope that the developed methods can provide practical and available technical means for actual operations of China's multi-energy complementary projects, and help to achieve the goal of "carbon peak, carbon neutralization".

     

/

返回文章
返回