核电厂汽轮机热力性能修正曲线校核及功率影响分析

Calibration of Thermal Capability Correction Curve of Steam Turbine and Analysis of Power Influence in Nuclear Power Plant

  • 摘要: 汽轮机热力性能修正曲线是机组性能考核试验的重要输入,曲线的准确性直接影响机组最终功率的合理性评价。本文通过收集某供应商多台核电机组的实际运行数据,并采用汽轮机热平衡法对修正曲线进行校核分析,结果表明:汽轮机功率背压特性曲线、主汽压力修正曲线与实际值偏离较大,功率背压特性曲线对试验结果的影响程度与试验背压值相关,试验背压越接近设计值,修正偏差量越小;主汽压力修正曲线对功率修正量偏差约3 MW,寿期初达到5 MW及以上。本文的分析结果,可为核电机组性能修正曲线的审查和试验考核及其结果评价提供借鉴和参考。

     

    Abstract: The steam turbine thermal capability correction curve is an important input of unit performance test,and the accuracy of the curve directly affects the reasonable valuation of the final power of the unit.This paper collected operational data of several nuclear power units of one supplier and applied the steam turbine heat balance method to check and analyze the correcting curves.Results showed that the power back-pressure characteristic curve and the main steam pressure correction curve deviate greatly from the actual values,the influence degree of the power back-pressure characteristic curve on the test results is related to the test back-pressure value.The closer to the design value of the test back-pressure,the smaller the correction deviation.The deviation of the main steam pressure correction curve for power correction is about 3 MW,and it reaches 5 MW or more at the beginning of the cycle.The analysis results of this paper can provide reference for the examination of the correction curves,performance test examination and the valuation of the test results for nuclear power plant.

     

/