绝缘斗臂车配合硬梯作业法在变电带电作业搭拆引流线中的研究与应用

The research and application of insulated bucket arm car combined with hard ladder working method in electrified substation

  • 摘要: 在变电站带电检修工作中,如何在设备运行状态下安全、高效开展断、接母线侧隔离开关引流线越来越成为变电检修工作中的一个重要的技术难题。本文主要针对变电站110-220kV母线侧隔离开关结构特点、布置形式,以及母线侧隔离开关引流线的规格型号、排列形式和连接方式等提出了采用绝缘斗臂车配合硬梯带电断、接引流线的作业方法,并对该种作业方法的关键步骤以及安全注意事项进行详细说明,为切实解决变电站110-220kV母线侧隔离开关引流线带电断、接作业提供技术支持和安全保障。

     

    Abstract: In the live maintenance of substations,How to safely and efficiently develop the tap-off line of disconnecting switch and connecting Busbar side disconnecting switch has become an important technical problem in substation maintenance work. This paper mainly aims at the structural characteristics and layout of 110-220kV bus-side isolating switches in substations, and the specification, type, arrangement and connection mode of the Busbar side isolator drain line are put forward. The operation method of using insulated bucket arm car with hard ladder live cut-off and connecting the drain line is put forward, the key steps and safety precautions of this operation method are explained in detail, which provides technical support and safety guarantee for solving the problem of live-off and connection operation of 110-220 kv bus-side isolating switch in substation.

     

/

返回文章
返回