660MW 超临界燃煤机组外网失电处置分析及应用
Disposal of power loss in external network of 660MW supercritical coal-fired unit Analysis and Application
-
摘要: 通过对胡布电站2×660MW超临界机组外网失电处置过程进行详细介绍,针对外网失电机组停运过程存在的危险点全面分析,制定针对性的控制措施,确保机组安全停运,不发生设备损坏,不发生人身伤害事故及扩大事故范围,为今后厂用电全失应急处置提供指导。Abstract: By Hubco China power plant 2 x 660 mw supercritical unit net disposal process of a detailed introduction, immobilized losing electricity on the plant process of danger point comprehensive analysis, make corresponding control measures, to ensure its safe shutdown, equipment damage does not occur, no personal injury accidents and expanding the scope of the accident, emergency disposition of auxiliary power lost all provide guidance for the future.