压板两端电压电位智能检测装置的研究与应用

Analysis of main transformer differential trip caused by electric welding

  • 摘要: 变电站内结合保护、安自、测控装置检修、缺陷处理或是电网运行方式的调整,有时需要投退一些保护、安自、测控装置压板,投入压板前必须测量压板两端电压无异极性时方可投入。另外测量压板两端电压电位,可以正确判断保护、安自、测控装置功能是否正常,是否能够投入。分析了操作人员在用万用表测量压板两端电压电为时因万用表挡位选择错误,导致开关跳闸误动作事件。研制一种新型智能压板两端电压电位检测装置,可以有效解决上述问题。

     

    Abstract: This paper introduces an accident of the first protection differential protection action and the second protection starting unaction of a main transformer caused by an external fault of a 110 kv substation, the cause of the first set of protection differential protection action of the main transformer is the three-phase short-circuit grounding fault of the 10 kv line on the low-voltage side of the substation, at the same time, the main transformer's first set of protection for the 10 kv side B phase differential current circuit is damaged at the secondary terminal connection of the current transformer, the current sampling of the first differential current circuit of the main transformer in 10 kv line fault is incorrect, which is not consistent with the current increase of 110 kv side and 35 kv side, cause the first set of protection ratio differential protection b-phase action jump off the main transformer three-side switch. According to the actual situation of the site and the analysis of the cause of action, the relevant solutions are put forward, which provide a reference for the prevention and solution of similar accidents.

     

/

返回文章
返回