特高压换流阀无尘化安装关键要点研究

Research on the key points of dust-free installation of UHV converter valve

  • 摘要: 特高压换流阀对安装环境和运行环境有着极高要求,本文从换流阀安装环境及安装条件出发,阐述了特高压换流阀安装的影响因素,从安装技术措施和管理措施层面提出了换流阀无尘化安装的九个关键要点,为工程现场安装提供参考。

     

    Abstract: UHV converter valve has extremely high requirements on the installation environment and operating environment. This paper starts from the installation environment and installation conditions of UHV converter valve, describes the influencing factors of UHV converter valve installation, and puts forward nine key points of dust-free installation of converter valve from the level of installation technical measures and management measures, so as to provide reference for engineering site installation.

     

/

返回文章
返回