某特高压±800kV换流站高填方边坡设计及研究

Research Study on the Stability of High Fill Slope in a ± 800kV UHV Converter Station

  • 摘要: 某特高压变电站位于浙江山区,站址地势起伏大,需要半挖半填处理。形成最大15m高的填方边坡和最大13m的挖方边坡,15m高填方边坡采用自然放坡+挡土墙+抗滑桩方案。本位通过通过稳定性计算和有限元分析,从各方面验算高边坡的安全性,均能满足规范要求。本文为工程设计提供了理论保障和指导意见,最终确保了特高压工程的安全运行。

     

    Abstract: An ultra-high voltage substation is located in the mountainous area of Zhejiang Province, with a fluctuating terrain that requires half excavation and half filling. A 15m high fill slope and a 13m high excavation slope are formed. The 15m high fill slope adopts a natural sloping+retaining wall+pile scheme. By conducting stability calculations and finite element analysis, the safety of high slopes can be verified from all aspects and meet the requirements of the specifications. This article provides theoretical support and guidance for engineering design, ultimately ensuring the safe operation of ultra-high voltage projects.

     

/