优化高压试验步骤,提高设备预试效率

Optimize the steps of high pressure test to improve the efficiency of equipment pre-test

  • 摘要: 目前,电力设备预防性试验,我们是按检修试验规程规定的试验项目对电力设备进行试验,规程只规定了试验项目,对大部分试验项目的顺序没有进行规定,不同的试验人员对被试品的试验项目顺序也就不同,近而工作效率也不相同。本文优化了电力设备高压电气预防性试验项目的顺序,并形成固化方案,提高了电力设备的预试效率。

     

    Abstract: At present, for the preventive test of power equipment, we test the power equipment according to the test items specified in the maintenance test procedure. The procedure only stipulates the test items, and the order of most of the test items is not specified. Different test personnel have different order of the test items for the subjects, and the work efficiency is also different. This paper optimizes the sequence of high voltage electrical preventive test items of electric power equipment, and forms a curing scheme to improve the pre-test efficiency of electric power equipment.

     

/