  • 摘要: 随着电网的发展,原来10kV供电的远距离重载线路逐步改造为35kV单进线单变变电站。对该类变电站设计时应考虑雷电侵入波造成中性点电压升高的防范措施,对于已投运的35kV变压器(YD11)宜采取有效措施,避免雷电侵入波造成设备损坏和非计划停运。

     

    Abstract: With the development of the power grid, the original 10kV power supply long-distance heavy-duty lines have gradually been transformed into 35kV single incoming single transformer substations. When designing such substations, preventive measures should be taken to prevent the rise of neutral point voltage caused by lightning intrusion waves. For 35kV transformers (YD11) that have already been put into operation, effective measures should be taken to avoid equipment damage and unplanned shutdown caused by lightning intrusion waves.

     

/