变电站多班组交叉作业管控措施的探讨

Discussion on control measures for cross operation of multiple teams insubstations

  • 摘要: 在变电站的检修、预试、改造工程中,会存在同一工作地点和设备上,或者同一空间、同一场地多个班组、互相不认识的人员同时作业的情况,这种情况被称为交叉作业,在交叉作业过程中,由于工作协调、人员配合、信息沟通等方面的原因,会造成设备损坏、人员受伤等异常和事故,如何有效避免交叉作业过程中的异常和事故,管控措施非常重要,本人结合以往交叉作业过程中出现的问题,谈谈管控措施的方法和要点,本篇层次分明、语言精炼,重点突出,通过本篇,你能真正的掌握变电站交叉作业管控措施。

     

    Abstract: In the maintenance, pre testing, and renovation projects of substations, there may be situations where personnel from the same work location and equipment, or multiple teams working in the same space and site, who do not know each other, work simultaneously. This situation is called cross operation. During the cross operation process, due to work coordination, personnel cooperation, information communication, and other reasons, equipment damage, personnel injury, and other abnormalities and accidents may occur, How to effectively avoid anomalies and accidents in the process of cross operation, control measures are very important. Based on the problems that have occurred in the past cross operation process, I will discuss the methods and key points of control measures. This article has a clear hierarchy, concise language, and prominent focus. Through this article, you can truly master the control measures for cross operation in substations.

     

/

返回文章
返回