大型发电厂取水工程优化利用码头岸线方案研究

Study on Optimal Utilization of Wharf Shoreline for Water Intake Project of Power Plant

  • 摘要: 某大型发电厂8×1000MW机组取水工程遵循占用码头岸线短、取低温海水、输水初期投资低、运行维护方便、有利于后续工程建设的设计理念,采用结合高桩码头潜水箱涵取水+明渠引水+汽机房前循环水泵房的取水方案,创造了码头结构缓建的条件,初期投资、规划容量总投资及叠加运行费用的年总费用最省。通过ANSYS FLUENT软件验证最不利工况下的循环水取水口对码头泊稳的安全性,合理缩短构筑物占用海岸线长度20%,构建科学合理的海岸线保护与利用格局,经济效益、社会效益、生态效益显著。

     

    Abstract: The water intake project of the 8×1000MW unit of a power plant follows the design concept of short waterfront occupation of the wharf, low temperature seawater extraction, low initial investment of water transmission, convenient operation and maintenance, and conducive to the construction of subsequent projects. The water intake scheme combining the submersible box intake of the high pile wharf and open channel intake and circulating water pump house in front of the turbine building has created conditions for the delayed construction of the wharf structure. The annual total cost of initial investment, total planned capacity investment and superimposed operating costs is the least expensive. ANSYS FLUENT software was used to verify the safety of circulating water intake on dock anchorage under the most unfavorable conditions, reasonably shorten the coastline length occupied by structures by 20%, build a scientific and reasonable coastline protection and utilization pattern, and achieve significant economic, social and ecological benefits.

     

/

返回文章
返回