山区老旧变压器抗短路能力不足运维策略

Operation and maintenance strategy for old transformer with insufficient short circuit resistance in mountain area

  • 摘要: 边远山区老旧变电站存在主变抗短路能力不足的情况,那么就要相应现场编制应急处置方案才行。特别是容易产生雷雨、冰雹、大风等乡镇,电网供电风险是挺大的。若是遇到变电站的主变抗短路能力不足,那么当供电线路上遭受暴雨突袭的情况下,有可能导致线路开关未动就越级到主变开关跳闸的大面积停电事故。而故障中的短路电流可能超过该节点变压器设计的承受能力,本文针对主变承受短路能力提出运维策略。

     

    Abstract: There is insufficient short-circuit resistance of main transformer in old substation in remote mountain area, so it is necessary to make emergency disposal plan on site. Especially easy to produce thunderstorm, hail, wind and other towns, power grid supply risk is quite large. If the substation's main transformer short-circuit resistance is insufficient, then when the power supply lines are hit by heavy rain, it may lead to line switches do not move over the stage to the main transformer switch trip a large-scale blackout accident. However, the short-circuit current in the fault may exceed the designed capacity of the transformer. In this paper, an operation strategy is proposed for the short-circuit capacity of the main transformer。

     

/

返回文章
返回