线路保护带负荷传动开关试验要点分析

The key points analysis of load transmission test for relay protection of high voltage transmission line

  • 摘要: 随着经济的增长,电力需求量越来越大,由于存在地区差异,电源结构存在问题。导致设备停电困难,对于重载、联络线路停电往往伴随电网风险和负荷减供。而今提倡的状态检修和差异化检修方式,使得电力系统内存在大量的多年未动作的设备,导致部分弹簧长期受力而形变不足或机构因恶劣的气候条件导致积灰严重导致拒动。通过线路保护带负荷传动的方式完成试验,以消除一二次设备潜在运行风险,成为我们本次研究的要点。

     

    Abstract: With the growth of the economy, the demand for electricity is increasing. Due to regional differences, there are problems with the power structure. Difficulty in equipment power outage, often accompanied by power grid risks and load reduction for heavy loads and interconnection line power outages. The current promotion of condition based maintenance and differentiated maintenance methods has resulted in a large number of equipment in the power system that has not been in operation for many years, leading to insufficient deformation of some springs due to long-term stress or severe ash accumulation in the mechanism due to poor weather conditions, resulting in refusal to operate. The key point of our research is to eliminate potential operational risks of primary and secondary equipment by completing the test through line protection with load and transmission.

     

/

返回文章
返回