一种用于区域电网的源网荷储一体化协调控制方案

An Integrated Coordinated Control Scheme for Source Network Load Storage in Regional Power Grid

  • 摘要: 随着国内源网荷储区域电网项目的增多,源网荷储区域电网在孤网运行过程中,存在一些技术问题,需要采取有效的技术措施,实现区域电网的孤立安全稳定运行。本文提出了一种适用于区域电网的源网荷储一体化协调控制方案,将整个系统分成三个层次的控制,保障源网荷储系统的稳定、经济运行,为并网型和独立型源网荷储提供安全、稳定、可靠的解决方案。

     

    Abstract: With the increasing number of domestic power grid projects in the source network load storage area, there are some technical problems in the isolated operation process of the "source network load storage" area power grid, and effective technical measures need to be taken to achieve the isolated, safe and stable operation of the regional power grid. This article proposes an integrated coordinated control scheme for source network load storage suitable for regional power grids. The entire system is divided into three levels of control, ensuring the stable and economic operation of the source network load storage system, and providing safe, stable, and reliable solutions for grid connected and independent source network load storage.

     

/