您当前的位置:
首页 >
文章列表页 >
Quantitative Evaluation of Regulation Capacity of Cascade Hydropower Stations for Extreme Fluctuations of New Energy Under Source-Load Matching
更新时间:2026-04-10
    • Quantitative Evaluation of Regulation Capacity of Cascade Hydropower Stations for Extreme Fluctuations of New Energy Under Source-Load Matching

    • PEARL RIVER   Pages: 1-21(2026)
    • CLC: TV7
    • Received:05 February 2026

      Revised:2026-03-20

      Accepted:30 March 2026

      Online First:10 April 2026

    移动端阅览

  • LI Bin,ZHANG Juntao,CHENG Chuntian.Quantitative Evaluation of Regulation Capacity of Cascade Hydropower Stations for Extreme Fluctuations of New Energy Under Source-Load Matching[J].PEARL RIVER, DOI:10.3969/j.issn.1001-9235...001.

  •  
  •  

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Review on the Method of Compensation Benefit Allocation for Cascade Hydropower Stations

Related Author

LI Yinghai
WANG Li
LI Qingqing
XIA Qingqing

Related Institution

College of Hydraulic & Environmental Engineering, China Three Gorges University
Engineering Research Center of Eco-environment in Three Gorges Reservoir Region,Ministry of Education, China Three Gorges University
Department for Comprehensive Utilization of Water Resources,Yangtze River Scientific Research Institute
0