Study on overvoltage in ±200 kV triple-circuit DC transmission lines on the same tower for an AC-to-DC transmission project
|更新时间:2025-09-16
|
Study on overvoltage in ±200 kV triple-circuit DC transmission lines on the same tower for an AC-to-DC transmission project
“In the field of power transmission, the Yangzhou Zhenjiang DC project demonstrated the technology of AC to DC conversion, significantly improving transmission capacity and providing technical basis for the design of three circuit DC transmission on the same tower.”
Moren Journal(2025)
作者机构:
1.国网江苏省电力有限公司,南京 210000
2.国网江苏省电力有限公司建设分公司,南京 210000
3.中国电力工程顾问集团华东电力设计院有限公司,上海 200000
4.重庆大学 电气工程学院,重庆 400044
作者简介:
基金信息:
DOI:
CLC:
Received:25 September 2024,
Revised:2024-11-18,
稿件说明:
移动端阅览
CHEN Songtao, CHEN Bing, WU Wei, et al. Study on overvoltage in ±200 kV triple-circuit DC transmission lines on the same tower for an AC-to-DC transmission project[J/OL]. Moren journal, 2025.
DOI:
CHEN Songtao, CHEN Bing, WU Wei, et al. Study on overvoltage in ±200 kV triple-circuit DC transmission lines on the same tower for an AC-to-DC transmission project[J/OL]. Moren journal, 2025.DOI:
Study on overvoltage in ±200 kV triple-circuit DC transmission lines on the same tower for an AC-to-DC transmission project